• OR10: The 5th International Conference on Open Repositories (Madrid, Spain, Jul 6-9, 2010)
• CRIS2010: Connecting Science with Society (Aalborg, Denmark, Jun 2-5, 2010)
• Learning how to play nicely: Repositories and CRIS (Leeds Metropolitan University, Leeds, UK, May 7, 2010)
• Repository Multiple Deposit meeting (London, UK, Apr 8, 2010)
• Readiness for REF (R4R) Workshop (King's College London, Mar 23, 2010)
• OpenAIRE Inaugural Conference (Athens, Greece, Jan 13-14, 2010)
• JISC Deposit Show-and-Tell Barcamp (University College London, Oct 12, 2009)
Showing posts with label OAI6. Show all posts
Showing posts with label OAI6. Show all posts
Wednesday, 14 April 2010
Meetings held & Documents available
• International Repository Workshop (Amsterdam, Mar 16-17, 2009)
Repository Handshake strand - Action plan
• Edinburgh workgroup meeting (EDINA, Edinburgh, June 10, 2009)
Notes on meeting
Repository Handshake (actor-based) use case scenarios: a summary
Notes from whiteboard
• OAI6 Workshop on Innovations in Scholarly Communication (CERN, Geneva, June 17-19, 2009)
The Repository Handshake - a followup
• Copenhagen workgroup meeting (DTU, Copenhagen, Aug 12, 2009)
Notes on meeting
• Madrid workgroup meeting (CSIC, Madrid, Nov 2, 2009)
Notes on meeting
• Informal workgroup meeting in Cambridge (Cambridge, UK, Mar 21, 2010)
Repository Handshake strand - Action plan
• Edinburgh workgroup meeting (EDINA, Edinburgh, June 10, 2009)
Notes on meeting
Repository Handshake (actor-based) use case scenarios: a summary
Notes from whiteboard
• OAI6 Workshop on Innovations in Scholarly Communication (CERN, Geneva, June 17-19, 2009)
The Repository Handshake - a followup
• Copenhagen workgroup meeting (DTU, Copenhagen, Aug 12, 2009)
Notes on meeting
• Madrid workgroup meeting (CSIC, Madrid, Nov 2, 2009)
Notes on meeting
• Informal workgroup meeting in Cambridge (Cambridge, UK, Mar 21, 2010)
Sonex timeline
At the Amsterdam workshop the initial time horizon was estimated to be two to three years in a multi-phase activity, with Phase 1 being rapid engagement over a six+ month period. Once the RH workgroup started dealing with the use case analysis and selection for implementation, the timeline was scheduled in terms of milestones:
June 2009 - State of development of Repository Handshake works to be summarized at OAI6 (CERN Workshop on Innovations in Scholarly Communication) in Geneva
October 2009 - Production of a 2-page preliminary workplan document for each of the three selected use-case scenarios in relation with actual projects being presently developed. To be presented at the JISC Deposit show and tell barcamp, London, Oct 12th. Upload of resulting information to the wiki http://repinf.pbworks.com/
End of 2009 - Gap analysis and complete study of all selected use cases
2010 - JISC Deposit Call - SONEX potential supporting role
June 2009 - State of development of Repository Handshake works to be summarized at OAI6 (CERN Workshop on Innovations in Scholarly Communication) in Geneva
October 2009 - Production of a 2-page preliminary workplan document for each of the three selected use-case scenarios in relation with actual projects being presently developed. To be presented at the JISC Deposit show and tell barcamp, London, Oct 12th. Upload of resulting information to the wiki http://repinf.pbworks.com/
End of 2009 - Gap analysis and complete study of all selected use cases
2010 - JISC Deposit Call - SONEX potential supporting role
Subscribe to:
Posts (Atom)